Current Projects
Project: Arkansas Baptist College Dining Hall
Location: Little Rock, AR
Architect: SCM Architects
The newest structure on the growing Arkansas Baptist College campus will be approximately 10,200 square feet. It includes a pre-engineered metal building structure. The roof is a combination of standing seam and membrane roofing systems. The building exterior is comprised of glazed aluminum storefront, brick veneer, manufactured stone, and stucco. The attractive facility is designed to meet the requirements of the Central High Overlay District. Interior finishes include a combination of vinyl tile & ceramic flooring, painted walls and vinyl wall coverings, and acoustical ceilings. The kitchen is fully-furnished with coolers, freezers, dishwashing station, and plenty of food storage areas.
The project will be complete for the fall 2011 semester.
Project: Mid-South Community College Renewable Energy Center
Location: West Memphis, AR
Architect: PKM Architects
New, 30,000 SF facilities for bio-diesel research, diesel equipment and engine testing, diesel technology, and truck maintenance. Project will feature a state-of-the-art system for vehicle exhaust removal. A geothermal mechanical system will employ a heated slab and spot-cooling technologies.
Project: Calvary Baptist Church Worship Center
Location: Little Rock, Arkansas
Architect: Fennell Purifoy Architects
Demolition of the existing sanctuary, basement, and part of the education building was necessary before construction of the new sanctuary could begin. Calvary Baptist’s new sanctuary seats 788 and includes exposed wood beam trusses. The 17,246 square foot project includes a new fellowship hall/meeting area, classrooms, and choir rooms. The building exterior is composed of brick veneer and cast stone panels.
Project: Donald W Reynolds Northwest Arkansas Children's Shelter
Location: Highfill, Arkansas
Architect: JKJ Architects - John Mack
This 66,232 square foot campus resides on an 88 acre tract just west of Bentonville. The site contains three structures in Phase I consisting of the Emergency Shelter at 43,146 square feet, a Recreation Building at 17,500 square feet, and a Maintenance Storage Facility at 5,600 square feet.
The Shelter provides a residence for 36 Children, School Classrooms & Administrative Offices. The Recreation Center offers a full size Basketball Court, Multi-Purpose Activity Room and a Game Room / Student Lounge Area. The Maintenance Building houses equipment and an area for receiving donated clothes and food.
Project: Eureka Springs High School
Location: Eureka Springs, AR
Architect: Morrison Architecture
Kinco was selected by the Eureka Springs School Board to be the Construction Manager/General Contractor for the demolition of their old high school and the construction of a new one. Kinco has been working with the school board and Morrison Architects to help pass a millage increase and is currently in the pre-construction phase to help better define the project scope and campus amenities.
Project: Park Centre
Location: Fayetteville, AR
Architect: Miller Boskus Lack Architects
This beautiful new 68,404 square foot 4 story office building combines a traditional brick and glass façade with stylish aluminum fascia and cost saving stucco. Located on Zion Road, bordering Lake Fayetteville Park, this spacious new building provides many opportunities for leased office space. Twin elevators and stair towers provide vertical transportation from floor to floor while each floor contains a mechanical/electrical room as well as centralized men’s and women’s restrooms. The store front glass system provides a beautiful landscaped view from all four floors while offering ample natural lighting opportunities and the quintessential “corner office” experience. This building is complemented by two additional buildings which include 35,342 square feet of retail space.
Project: Westside Elementary School
Location: Hartman, AR
Architect: Lewis Elliott & Studer Architects
Kinco has been selected by the Westside School District as Construction Manager/ General Contractor for the construction of a new K-4 facility on their Hartman campus. Work is just under way on the new 20,000 square foot, 16 classroom project. The scope of work includes demolition of 3 existing buildings on the site. The building has a standing seam roof and brick veneer exterior. It also features an integrated, cast-in-place concrete tornado shelter. Work will be complete for occupancy before the 2011 fall semester.